National Landing Hub
- Price from /m²
- On request
- Handover
- Completed (2025)
- Flats
- 1800 flats22 floors
- Built100%
Details
- Price from /m²
- On request
- Built
- 100%
- Handover
- Completed (2025)
- Flats
- 1800 flats
- Floors
- 22 floors
- Location
- Arlington, Washington D.C.
Building in 3D
22 floors · 1800 flats · 100% built · hover a floor
הדרך שלך
הוסיפו עבודה או בית ספר — בכל מודעה יוצג המרחק.
Area
- Country
- United States
- City
- Washington DC
- Address
- Arlington, Washington D.C.
- To Center
- 5.2 ק״מ · תחב״צ ~22 דק׳ · רכב ~14 דק׳
- Nearest Metro
- Pentagon City · 489 מ׳ · ברגל ~6 דק׳
- Air & Ecology
- AQI 41 · Moderate
All Media
Photos & renders: 1
About the project
Transformational smart urban neighborhood surrounding Amazon HQ2 campus with parks and metro transit.
Spotted an inaccuracy? Tell us
Frequently asked questions
How much is a square meter in National Landing Hub?
National Landing Hub — Arlington, Washington D.C.. Prices are available on Sivrce.
When will National Landing Hub be handed over?
Handover date: Completed (2025). Construction progress: 100%. Total 1800 flats, up to 22 floors.
Which frame condition are apartments sold in at National Landing Hub?
New developments in Georgia are typically sold in three conditions: black frame (shell only), white frame (ready for renovation — plaster, wiring, screed) and green frame (near-complete). Confirm the exact condition for National Landing Hub with the developer's sales office.
Can I buy an apartment in National Landing Hub with an installment plan or mortgage?
You can buy in National Landing Hub with a developer installment plan (typically 10–30% down, payments until handover) or a bank mortgage. Confirm details with the developer or contact us on Sivrce.
Who builds National Landing Hub?
Developer: JBG SMITH. Full profile, other projects and reviews: sivrce.ge/developers/jbg-smith.
Is buying in National Landing Hub a good investment?
Buying under construction is usually cheaper than a completed unit — prices rise toward handover. Rental yield and ROI in Washington D.C. depend on the district and frame condition; compare similar projects on Sivrce.
מתעניינים?
ההודעה נשלחת ישירות אל National Landing Hub
ביקורות
כתיבת ביקורת
התחברו כדי לכתוב ביקורתהיו הראשונים לכתוב ביקורת
החוויה שלכם תעזור לאחרים לבחור נכון.
